| [#6: Edit Options>MightyAdsense>Adsense Code] |
Bravo India, Bravo for deploying the Bandra-Worli Sealink . It comes just in time for having the future generations of Indians to realize the magnitude of changes required in India for creating a measurable impact.
![]()
- Decreased traffic congestion
- Shortened commute time by 1+ hour
- Serves as a flagship model for types of infrastructure changes India must accommodate growing numbers of vehicles on road
Other major projects they should consider:
- 25 km sealink between Okha and Mandvi
- 15 km sealink between Surat-Bhavnagar Sea link
- Implementing easy to understand names/addresses facilities to roads/land blocks
- Implementing Technology to facilitate ease-of-use for the transportation system:
- Automatic toll collection
- Electronic Hazzard signs
- Electronic data collection and transmitters along roadways
- Proper sign placement
- Avalibility and accessibility of map
Powered by MightyAdsense